Paving & Utility Install Project for Temp FS 29
In general, the Work includes demolition, paving and minor utility work. The specific work descriptions are detailed in N-4 of the Bid Documents and illustrated in Drawing P-1.
Specs
(click to expand/collapse)

Name | Date | Size | ||
Temp FS 29 | 8/23/2023 | 2.3 MB |