FS 30 Tower Project

In general, the Work includes demolition in the form of foundation excavation with no concrete sawcutting or removal as the proposed tower location is in a dirt area of a graded terraced hillside. The tower location is on a level pad graded area. However, minor grading, slope protection, BMP installation and track walking may be required based on the site access path chosen by the Contractor. The tower site is only accessible through adjacent properties and the access path shall be chosen by the contractor for their desired approach for equipment access. This will include negotiating an access agreement with adjacent property owners and/or potentially needing an encroachment permit from the City of Thousand Oaks, depending on the path chosen. The Fire District can provide past coordination with adjacent ownership for access to this area but cannot promise similar access would be allowed again. The pre-bid meeting is non-mandatory but attendance is strongly suggested to view the terrain and potential access restrictions ahead of time.
Specifications (click to expand/collapse)
Order this section for $15.00
This is available for download & digital takeoff to registered users Log in now
Name Size
FS 30 - Tower Project - Bid_Set- 9.8 MB