FS 54 Tower

In general, the Work includes demolition in the form foundation excavation with no concrete sawcutting or removal as the proposed tower location is currently a DG area. New construction consists of a reinforced concrete drilled pier foundation, installation of one, new, 60-foot high, Owner-furnished Contractor-installed (OFCI) Magnum SSM Self-Supporting Antenna Tower (herein Magnum Tower or Tower), associated anchoring, grounding, cabling and conduit, for connection within the communications electrical room of the Fire Station. Only the exterior improvements are included in the Work. The work on the interior of the communications room will be performed by others. The exterior Work includes the new galvanized cable tray from 60-foot tower to electrical room and all bridges, supports, posts, cantilever building-attached support brackets, entry ports, ground bus bars, and other to meet Motorola R-56 Grounding requirements. DG areas around the new tower foundation shall be cleaned up, compacted and mildly sloped away from the foundation.
Plans (click to expand/collapse)